engineered flooring

Engineered Flooring HOWTO v2.0

Posted by Steve on Sun, 04/15/2007 - 1:04am


I don't like drywall. I like plaster. I don't like composite mouldings. I like hardwood. I don't even like prefab mouldings. I like to cut my own. So why would I like something as new-fangled and artificial as engineered flooring?

Actually, I don't. Even though I went through bloody hell to lay those herringbone floors in the living room, solid hardwood is still my first choice. But there were reasons why engineered flooring was the better option for the second floor in my house. One is that I didn't want to add an extra 1.25" to the height of the top stair. That's what would have been required if I'd gone with 3/4" hardwood. I can't count the number of times I've tripped because of uneven stair heights, on one occasion fracturing a shoulder. Also, an engineered floor has a finish at least twice as hard as that of any job-site applied finish. With two big dogs tearing up my hardwood floors downstairs that's not a small selling point for me. However, there's a big "but" with this stuff which I'll get into later.

Phase 7: The Wrath of Details

Posted by Steve on Fri, 09/08/2006 - 11:36am


Today officially begins the scheduled start of the next major phase of the renovation at Brooklyn Row House: the rebuilding of the master bedroom and upstairs hallway. It started like most of my scheduled projects. In other words, it didn't.

Dykes Lumber, which was given instructions to call me before delivery, arrived yesterday when I must have been out walking the grovelers. Granted, it's a contractor size order but, sheesh, even GC crews take lunch breaks, guys. They didn't call to confirm that they were even delivering yesterday so I could at least hang a note. For that matter, I still don't know what the charge is, although I'm figuring in the $2500 range.

The delivery was rescheduled for Monday which isn't much of a setback because my weekend is shot anyway.

Speak of the devil, the flooring just arrived from Hosking Hardwood: thirteen cartons of Mannington engineered flooring and accessories.

I used Mannington flooring in my office and guest room renovations and the jury's still out with it. I'm already seeing some scratch marks from the dogs' claws. I probably won't be ready to lay the floor until around Thanksgiving at this rate. Before then I have to make some serious progress on building a new referral management system for Children's Health Fund. At least the flooring will be well acclimated to the house by then.

Referring back to an article I wrote last week, Last Lap Crash, I guess I was successful at psyching myself up for this next phase of the renovation. For the past three days I've been running around the house taking care of unfinished business. Yesterday I bought a bunch of drawer and cabinet pulls from The Great Indoors and finally finished off the kitchen, five years after I started it.


Guest Room

Renovation By The Numbers


A few House page viewers asked me to walk them through a typical room renovation. This room already had a lightweight renovation when I moved in and needed to set up my office quickly. Now it will undergo a complete refab for a guest room.

Generally speaking, I have a few fixed strategies for renovation, at least in this house:


Subscribe to engineered flooring